April18, 2011
After building the frame work I would sand and finish the frame before installing it in the trailer.
This is the frame work for the closet and refrigerator, I also have some
drawers below the refrigerator. This is one place I made a change from
the original pattern, the old pattern had the refrigerator on the
bottom, I wanted it higher so I wouldn't have to lean down each time I
needed something out of the refrigerator.
You can see the space made for the refrigerator and the space for the drawers below it. On left side of the closet wall you can see has supports for shelves.
The frame work is just about completed and has been installed . The original refrigerator was gas but it was in bad shape, so I replaced it with a new one that is electric. You can see the vent in the side of the trailer that will keep it from over heating.
In the bottom picture when when we had completed the frame we then
installed a piece of finished birch veneer on the the outside of the
closet frame.
No comments:
Post a Comment