My wife is checking our measurements, so this bed will be just right when we finish building the gaucho couch. It was cold that day but she is a real trooper and has been a big help. This is her little Sweet Pea, too. She is going to add the ladies touch to it when we have finished with the rebuilding.
Sunday, December 4, 2011
A Gaucho Couch = Sweet Dreams
My wife is checking our measurements, so this bed will be just right when we finish building the gaucho couch. It was cold that day but she is a real trooper and has been a big help. This is her little Sweet Pea, too. She is going to add the ladies touch to it when we have finished with the rebuilding.
Friday, December 2, 2011
Building the bed frame for the double bed

February 17 2010
That is my wife and my son sitting to the left of me. We were putting our heads together planning the frame so that my wife and I would both be comfortable at night when we would be using the trailer.
This is my son and I burning a little night oil while working on the the rear bed frame. The exterior of the trailer is pretty close to as it came from the factory except for the furnace vent by the door. The inside I changed a few things a little to make it more comfortable for us. The original seat went all the way across the back,but would not pull out for two people. We built the bed to where it had storage under it and also would pull forward so the back cushion could slide down and make a double bed
That is the framing in place and veneer running across the front. The two outside storage spaces you get two from the outside compartment doors, the center storage you raise the plywood that the cushions rest on to get what you need .
This just another shot of the frame, and floor.
Thursday, December 1, 2011
Putting the new floor in the trailer.
October 19, 2010
We knew that we wanted a black and white checker board pattern, because it fit that time period for the trailers of the 60's. We looked for this flooring for quite a while before we found it, the correct size of tile which was in preportion to the size of the trailer. Fortunately, we found this Armstrong remnant for a 1/3 of what it would cost off the roll.
You are looking at the finished floor with all the veneer in place. Before we cut the linoleum flooring I had to prepare the floor of the trailer, fill any small anchor bolt holes are places that were not even in the floor. After that was completed I rolled out the linoleum floor cut it to fit around fender wells then started gluing the floor down working from the back of the trailer to the front. This is a two person job so that when you roll the flooring up some to put the glue down you don't tear it when you roll it back out in place.
This was not that hard to do, just measure twice before you cut and get some one to help you, it will make it go much better. I also want to back up just a little to tell you that before I put the veneer back in the trailer I took the trailer to a trailer repair shop. I had them run new wire from front to rear, put a new plug in on the front, hook up the electric trailer brakes and run new wire for clearance lights, turn signals and brake lights. I made sure all those lights were working before I put the veneer in.
We knew that we wanted a black and white checker board pattern, because it fit that time period for the trailers of the 60's. We looked for this flooring for quite a while before we found it, the correct size of tile which was in preportion to the size of the trailer. Fortunately, we found this Armstrong remnant for a 1/3 of what it would cost off the roll.
You are looking at the finished floor with all the veneer in place. Before we cut the linoleum flooring I had to prepare the floor of the trailer, fill any small anchor bolt holes are places that were not even in the floor. After that was completed I rolled out the linoleum floor cut it to fit around fender wells then started gluing the floor down working from the back of the trailer to the front. This is a two person job so that when you roll the flooring up some to put the glue down you don't tear it when you roll it back out in place.
This was not that hard to do, just measure twice before you cut and get some one to help you, it will make it go much better. I also want to back up just a little to tell you that before I put the veneer back in the trailer I took the trailer to a trailer repair shop. I had them run new wire from front to rear, put a new plug in on the front, hook up the electric trailer brakes and run new wire for clearance lights, turn signals and brake lights. I made sure all those lights were working before I put the veneer in.
Wednesday, November 30, 2011
Sweet Pea (In the beginning)
Gary has worked so hard to restore our little Shasta travel trailer. We named her "Sweet Pea" so I thought it would be good to remember where we started because this process has taken a year at this point.
Back to the inside to put in insulation and start replacing veneer,and new wiring
Augustl 1, 2010
I reworked wiring and added some extra circuits in the trailer,so we would have the outlets we needed and also be able to handle the amps. we would need. You can also see that the wooden studs in the walls and over head wood is only 1by2 inch pine. The ceiling was sagging down some, so I bought some 3/4 inch aluminum angle and screwed them in on each side. That would help a lot when I went back with the new Birch veneer.
The insulating of the trailer went pretty fast, I bought 4 by 8 foot sheets of insulation and cut it to fit. The insulation was 3/4 inch same thickness as the pine wood. I would mark the width I needed with A black pen then cut it with a razor blade knife , I also had a Roto-Zip tool that came in handy.
You can see the copper tubing and wire in the side of the wall. That is when I got my note book back out and made a drawing of every stud and brace in each side,top, back, and front of trailer. When you begin to put veneer back in you have to know where those wires are so you want run a nail or screw in them.
I've been working hard replacing the insulation and veneer. The blue masking tape is marking studs where wires are going though the wall. Buying prefinished veneer saved me a lot of time and work. If you use prefinished veneer do not leave the tape on any longer then necessary.
It's beginning to take shape again and look like a trailer on the inside although still along ways to go. You are looking at the overhead cabinets in the front of the trailer.
The shelf in the bottom picture will go in the back of the trailer. I had to remake it with new veneer. I used the old shelf as a pattern and also reworked front shelf. Getting the veneer back in the trailer really stiffened the trailer back up.
I reworked wiring and added some extra circuits in the trailer,so we would have the outlets we needed and also be able to handle the amps. we would need. You can also see that the wooden studs in the walls and over head wood is only 1by2 inch pine. The ceiling was sagging down some, so I bought some 3/4 inch aluminum angle and screwed them in on each side. That would help a lot when I went back with the new Birch veneer.
The insulating of the trailer went pretty fast, I bought 4 by 8 foot sheets of insulation and cut it to fit. The insulation was 3/4 inch same thickness as the pine wood. I would mark the width I needed with A black pen then cut it with a razor blade knife , I also had a Roto-Zip tool that came in handy.
You can see the copper tubing and wire in the side of the wall. That is when I got my note book back out and made a drawing of every stud and brace in each side,top, back, and front of trailer. When you begin to put veneer back in you have to know where those wires are so you want run a nail or screw in them.
I've been working hard replacing the insulation and veneer. The blue masking tape is marking studs where wires are going though the wall. Buying prefinished veneer saved me a lot of time and work. If you use prefinished veneer do not leave the tape on any longer then necessary.
It's beginning to take shape again and look like a trailer on the inside although still along ways to go. You are looking at the overhead cabinets in the front of the trailer.
The shelf in the bottom picture will go in the back of the trailer. I had to remake it with new veneer. I used the old shelf as a pattern and also reworked front shelf. Getting the veneer back in the trailer really stiffened the trailer back up.
Tuesday, November 29, 2011
Painting is Completed!! WooHoo!
July 8, 2010
Finally the painting was completed and this is the finished product after all the tape and paper has been removed. I painted the trailer hitch and bumper white to match the trailer.
When you are preparing your trailer for painting take your time when removing dings and dents in the siding. I thought I had done a pretty good job, but when I begin to spray that finish coat on I didn't have any problem seeing the area's that I should have given a little more tender loving care. I am still pleased with how it turned out. This one and one more will be two for me! HA HA
I had already rebuilt the door frame and prepared it for painting. So I just had to make sure I matched up the stripe on the door with the one on the trailer.
This has been a long process, sanding, priming and removing dents and dings. It is very important to
wear a good respirator during this process for your protection.
After having painted the trailer I removed the wheels and had them
powder coated to match the red stripe. I will next order baby moon hubcaps.
Finally the painting was completed and this is the finished product after all the tape and paper has been removed. I painted the trailer hitch and bumper white to match the trailer.
When you are preparing your trailer for painting take your time when removing dings and dents in the siding. I thought I had done a pretty good job, but when I begin to spray that finish coat on I didn't have any problem seeing the area's that I should have given a little more tender loving care. I am still pleased with how it turned out. This one and one more will be two for me! HA HA
I had already rebuilt the door frame and prepared it for painting. So I just had to make sure I matched up the stripe on the door with the one on the trailer.
This has been a long process, sanding, priming and removing dents and dings. It is very important to
wear a good respirator during this process for your protection.
After having painted the trailer I removed the wheels and had them
powder coated to match the red stripe. I will next order baby moon hubcaps.
Monday, November 28, 2011
Paint Booth, Priming and Taping
June 3, 2010
This was our make shift paint booth. We hung plastic from the rafters to the floor on three sides of the trailer. We wanted to keep as much dust as possible out of the painting area. I also did not want to get paint on everything else in the shop. We also put an exhaust fan in the front door to help pull the paint fumes out.
I put 2 inch masking tape around the trailer where the stripe was located. I then sprayed etching primer on all the bare metal, so that when I came back and primed the entire trailer it would all bond to the aluminum siding.
The top half has been primed and painted white then covered with paper again so the bottom of the trailer can be painted it's finish color of blue-green.
The trailer has been covered with paper and the stripe has been masked off so that the red stripe can be painted down the side of the trailer. This was quite a learning process.
This was our make shift paint booth. We hung plastic from the rafters to the floor on three sides of the trailer. We wanted to keep as much dust as possible out of the painting area. I also did not want to get paint on everything else in the shop. We also put an exhaust fan in the front door to help pull the paint fumes out.
I put 2 inch masking tape around the trailer where the stripe was located. I then sprayed etching primer on all the bare metal, so that when I came back and primed the entire trailer it would all bond to the aluminum siding.
The top half has been primed and painted white then covered with paper again so the bottom of the trailer can be painted it's finish color of blue-green.
The trailer has been covered with paper and the stripe has been masked off so that the red stripe can be painted down the side of the trailer. This was quite a learning process.
Subscribe to:
Posts (Atom)






